1. Preparation work
Before installing the impeller of the slurry pump, a series of preparatory work is required to ensure a smooth installation process and avoid potential problems in the future. These preparations include cleaning work, foundation preparation, dimensional measurement, and environmental requirement assessment.
Cleaning work: Remove debris inside and outside the equipment to ensure a clean appearance and unobstructed pipelines.
Foundation preparation: Ensure that the foundation is flat, has strong bearing capacity, is not easily deformed, and must be controlled according to requirements.
Dimensional measurement: Confirm the required dimensions and weight information of the equipment, ensure that the equipment selection meets the requirements, and can adapt to production requirements.
Environmental requirements: Pay attention to whether the environmental conditions can meet the requirements, including harsh environments, climate, temperature and other factors, which need to be adjusted according to the actual situation.
2. Installation process
The process of installing the impeller of the slurry pump needs to be strictly carried out according to the prescribed steps to ensure the correct installation of the impeller and other components.
Installation of pump body: Determine the direction and horizontal line of the pump, find the center of the pump to form a road, then place the base and fix the pump base with screws.
Connect the inlet pipeline: Install the inlet pipeline, and the pump pipe inlet should be kept straight. The angle of the pipeline should not exceed 6 ° and must meet the standard diameter requirements.
Connect the outlet pipeline: Connect the outlet pipeline through flanges to ensure safe and effective operation of the pump.
Installation of motor: Clean the housing and sliding parts, lift the motor, insert it into the base and pump feet, then insert the shaft sleeve of the motor into the pump shaft, and finally tighten the bolts between the motor base and the base.
Installation of transmission device: Determine the distance between the axis and other directions, adjust the position of the transmission shaft, and install according to the recommended installation position.
Sealing and filling material: Seal the pipeline and determine if there is any water leakage, especially when installing the conveying pump. It is necessary to prevent slurry from entering the pump pipe and causing pipeline blockage.
3. Debugging phase
The debugging phase is an important step to ensure that the impeller of the slurry pump is installed correctly and can operate efficiently.
Manual testing: Before officially using the slurry pump, the equipment needs to be tested.
Start trial operation: After the testing work is completed, conduct a trial operation to test whether the pump can work normally in a short period of time.
Adjust parameters: If there is an abnormal situation, it is necessary to check and adjust the corresponding parameters to confirm that the slurry pump can work normally. When adjusting parameters, it is necessary to make adjustments based on the actual situation before further testing work.
Routine maintenance: After equipment debugging is completed, routine maintenance is required, including weekly or monthly cleaning and inspection, to ensure long-term stable operation of the equipment.
4. Maintenance and upkeep
Regular maintenance and upkeep are essential to ensure the long-term efficient operation of the slurry pump impeller.
Regular inspection: Check the wear of pump body, impeller, seals and other components, and replace them promptly if any abnormalities are found.
Cleaning work: Clean the pump body and filter to prevent impurities from blocking and affecting the normal operation of the pump.
Lubrication inspection: Check the lubrication condition of components such as bearing seats, bearings, and sealing rings to ensure sufficient lubricating oil and no leakage.
Motor inspection: Regularly check the operating status of the motor, and if any abnormalities are found, immediately stop the machine for maintenance.
Performance testing: Regularly conduct performance testing on the pump to ensure that its working performance meets the requirements.