Key points for installation and commissioning of slurry pump motor and pump body


Preparation work before installation

Before installing the slurry pump, a series of preparatory work needs to be carried out, including cleaning, foundation preparation, dimensional measurement, and environmental requirement assessment:

1. Cleaning work: Remove debris inside and outside the equipment to ensure a clean appearance and unobstructed pipelines.

2. Foundation preparation: Ensure that the foundation is flat, has strong bearing capacity, is not easily deformed, and must be controlled according to requirements.

3. Size measurement: Confirm the required size and weight information of the equipment, ensure that the equipment selection meets the requirements, and can adapt to production requirements.

4. Environmental requirements: Pay attention to whether the environmental conditions can meet the requirements, including harsh environments, climate, and temperature factors.

Installation process

The process of installing a slurry pump includes the following steps:

1. Install the pump body: Determine the direction and horizontal line of the pump, find the center of the pump to form a road, then place the base and fix the pump base with screws.

2. Connect the inlet pipe: The pump pipe inlet needs to be kept straight, the angle of the pipe should not exceed 6 °, and it must meet the standard diameter requirements.

3. Connect the outlet pipeline: Use flange connection to ensure safe and effective operation of the pump.

4. Install the motor: Clean the housing and sliding parts, lift the motor, insert it into the base and pump feet, then insert the motor shaft sleeve into the pump shaft, and finally tighten the bolts between the motor base and the base.

5. Install the transmission device: Determine the distance between the axis and other directions, adjust the position of the transmission shaft, and install it according to the recommended installation position.

6. Sealing and filling materials: Seal the pipeline and determine if there is any water leakage.

Debugging phase

Debugging is a key step to ensure the normal operation of the slurry pump, mainly including the following:

1. Manual testing: Before officially using the slurry pump, the equipment needs to be tested.

2. Start trial operation: Test whether the pump can work normally in a short period of time.

3. Parameter adjustment: If any abnormal situation occurs, it is necessary to check and adjust the corresponding parameters to confirm that the slurry pump can work normally.

4. Routine maintenance: After equipment debugging is completed, routine maintenance is required, including weekly or monthly cleaning and inspection, to ensure long-term stable operation of the equipment.

Maintenance precautions

In order to ensure the long-term stable operation of the slurry pump, the following maintenance items need to be noted:

1. Bearing maintenance: The water pressure and volume of the bearing should meet the regulations, and the tightness of the packing should be adjusted (or replaced) at any time. Do not cause leakage of the shaft seal, and replace the shaft sleeve in a timely manner.

2. Bearing replacement: Ensure that the bearing components are dust-free and the lubricating oil is clean. The bearing temperature during pump operation should generally not exceed 60-65 ° C, with a maximum of 75 ° C.

3. Coaxiality between motor and pump: Ensure the coaxiality between motor and pump, ensure the integrity and correctness of the elastic pad in the coupling, and replace it promptly if damaged.

4. Suction pipeline system: The suction pipeline system must be leak free, and attention should be paid to whether there is any blockage at the suction inlet during operation.

By detailed implementation of the above points, the correct installation and commissioning of the slurry pump motor and pump body can be ensured, thereby ensuring the efficient and stable operation of the pump.

  This article originates from https://www.fuyangpumps.com/news/404.html. Please indicate the source when reprinting.

(Editor in charge: Slurry Pump https://www.fuyangpumps.com/)

CONTACT US

  • Contact person: Manager Wang
  • Mobile: 86 15188770013
  • Tel: 86 312-3427818
  • Fax: 86 312-3421668
  • WhatsApp: 86 15188770013
  • Wechat: ymm3427
  • Q Q: 357577440
  • Email: fuyangby@126.com
  • website:https://www.fuyangpumps.com/
  • Address: Industrial Park, Anguo City, Hebei Province
  • Wechat

  • WhatsApp

Copyright © Hebei Fuyang Pump Industry Co., Ltd.