fuyangby@126.com

86 15188770013

Key items that need to be rechecked after adjusting the slurry pump


1. Inspection of mechanical seals

Mechanical seal is an important component to prevent liquid leakage inside the slurry pump. After adjustment, check whether the mechanical seal is intact and whether there is any leakage. Especially for multi-stage series slurry pumps, the integrity of mechanical seals is crucial as they need to operate completely leak free.

2. Inspection of hardness requirements

The components of the slurry pump usually need to have a certain degree of hardness to resist wear and tear. Generally, the hardness is required to be between HRC58-62. Therefore, after adjustment, it is necessary to check whether the components of the pump meet this hardness requirement, especially those that are prone to wear and tear.

3. Inspection of design and structure

After adjusting the slurry pump, a detailed inspection should be conducted to ensure that the overall structure and working principle of the pump meet the design requirements. This includes checking whether the various components of the pump are installed correctly and whether the working principle of the pump is applied correctly.

4. Inspection of performance characteristics

Different types of slurry pumps, such as centrifugal slurry pumps and swirl pumps, have different performance characteristics. After adjustment, the performance characteristics of the pump should be checked to see if they meet expectations, such as whether parameters such as flow rate, head, and efficiency are within the design range.

5. Inspection of blade design

The design of blades has a significant impact on the performance of solid-liquid two-phase flow slurry pumps. After adjustment, the blade design should be checked for rationality, any damage or wear, and whether further optimization is needed.

6. Inspection of the self-control system

If the slurry pump is equipped with an automatic control system, after adjustment, the software and hardware of the automatic control system should be checked for normal operation. This includes checking whether the various functions of the control system are functioning properly and whether there are any settings that need to be adjusted.

conclusion

The inspection of the above items is crucial to ensure the stable operation of the slurry pump after adjustment. Regularly conducting these inspections can help identify potential problems in a timely manner, prevent larger failures from occurring, thereby extending the service life of the pump and ensuring its efficient operation.

  This article originates from https://www.fuyangpumps.com/news/302.html. Please indicate the source when reprinting.

(Editor in charge: Slurry Pump https://www.fuyangpumps.com/)

CONTACT US

  • Contact person: Manager Wang
  • Mobile: 86 15188770013
  • Tel: 86 312-3427818
  • Fax: 86 312-3421668
  • WhatsApp: 86 15188770013
  • Wechat: ymm3427
  • Q Q: 357577440
  • Email: fuyangby@126.com
  • website:https://www.fuyangpumps.com/
  • Address: Industrial Park, Anguo City, Hebei Province
  • Wechat

  • WhatsApp

Copyright © Hebei Fuyang Pump Industry Co., Ltd.